Solutions for Every Boring Challenge

Real problems from real contractors. See how Bore-ON Central solves them.

Problem #1

"Customer Won't Pay—Distance Doesn't Match"

You installed 1,200 feet of conduit. Your GPS shows 1,180. The customer's surveyor measured 1,150. Your material spool shows 1,220. Now the customer is withholding $2,400 until you "prove" the footage.

The Typical Outcome:

  • Weeks of back-and-forth emails with spreadsheets
  • You settle for the lower number just to get paid
  • $2,400 lost on a single work order
  • Customer relationship damaged
Bore-ON Solution

Triple-Verified Distance Tracking

Our system tracks distance three independent ways and validates they match within 5% before allowing the log to be saved.

GPS Path Tracking

Full waypoint path captures curves and actual route. Crew's phone automatically logs every GPS point.

Survey Station Calculation

Station-to-station math matches customer's survey marks. Auto-detects road crossings.

Material Spool Validation

Crew enters start/end footage from reel. System confirms material used matches installed footage.

Result: Zero billing disputes.

All three measurements logged and included with invoice. Customer can't argue with triple verification.

Bore-ON Solution

AI-Powered MISS DIG Processing

Upload PDF, get complete ticket data in seconds. Utility polygons automatically overlay on your project map.

Instant PDF Parsing

AI extracts ticket number, dates, utility responses, contact info. Handles any format.

Polygon Extraction

Utility locations automatically overlaid on map. See exactly where gas, electric, water lines are.

Expiration Alerts

System tracks expiration dates (14-28 days). Alerts before tickets expire. Never work on expired ticket.

Result: Zero utility strikes from expired tickets.

Complete audit trail. Prove clearance on any date. Protect your crews and your business.

Problem #2

"We Hit a Gas Line—Ticket Was Expired"

Your foreman didn't realize the MISS DIG ticket expired 3 days ago. Crew hit a gas line. Now you're facing fines, emergency response costs, regulatory investigation, and potential liability.

The Typical Outcome:

  • Thousands in fines and emergency response costs
  • Work stoppage on entire project
  • Weeks of regulatory paperwork and investigation
  • Damaged relationship with customer and utilities
  • Insurance rates increase
Problem #3

"It Takes 3 Days to Process Payroll"

End of the week. You're chasing down 5 crews for their timesheets. Half are incomplete. Material counts don't match. You're manually entering data into spreadsheets until midnight Friday.

The Typical Outcome:

  • 40+ hours per month spent on payroll processing
  • Invoices go out 2-3 weeks after work completed
  • Errors in material counts mean lost revenue
  • Cash flow delayed waiting for invoice approval
Bore-ON Solution

Zero-Entry Invoice Generation

Crews log work once in the field. System auto-validates and generates invoices. 80% faster than manual process.

Real-Time Crew Logging

Crews log work in field as they complete it. GPS, materials, photos all captured together.

Automatic Validation

System validates distance accuracy, material usage, photo requirements. Errors caught immediately.

One-Click Invoice Generation

Select date range, click generate. Invoice ready with line items, quantities, rates, audit trail.

Result: Invoice same day work is completed.

Get paid 2-3 weeks faster. 40 hours per month freed up for growing the business.

Bore-ON Solution

Reel-Level Material Tracking

Every spool tracked. Usage validated against installed footage. Waste calculated. Complete accountability.

Spool Reading Validation

Crew enters start and end footage. System compares to installed distance. Flags mismatches.

Work Order Assignment

Every reel assigned to specific work order. Know exactly which project used which material.

Waste Calculation

Automatic calculation of waste. Identify excessive waste. Track by crew for accountability.

Result: Significant reduction in material loss and waste.

Complete accountability eliminates theft and excessive waste. Better inventory forecasting.

Problem #4

"2,000 Feet of Conduit Just Disappeared"

You ordered 5 reels of 2" HDPE conduit. Your crew logged 8,000 feet installed. But the reels had 10,000 feet total. Where did the other 2,000 feet go? Theft? Waste? Wrong job site?

The Typical Outcome:

  • $1,200+ in lost material (at $0.60/ft for 2" HDPE)
  • Can't determine if it was theft, waste, or logged to wrong project
  • Crew accountability impossible without data
  • Happens on multiple projects monthly

See How Bore-ON Solves Your Problems

These aren't hypothetical scenarios. These are real problems costing you thousands every month. See the solutions in action.